In November this year HORN® received the order for the cold repair of furnace 2 for the Austrian parent plant in Koeflach.
This is a 93.75 m² end fired furnace with six forehearths for the production of container glass. In the future the plant will produce 270 tonnes of flint glass per day. The existing furnace will be enlarged by HORN® and equipped with new heating equipment and safety control. Furthermore, it will be equipped with a new melting boosting system, a new HVR® 700F-2P batch charger and further furnace equipment.
Shortly after the order was placed, the first video conference for coordination talks with Stoelzle Oberglas GmbH regarding the cold repair took place. At this point we wish all parties involved a successful and trouble-free project.
15.12.2020, Horn Glass Industries
News material on the Site is copyright and belongs to the Company or to its third party news provider, and all rights are reserved. Any User who accesses such material may do so only for its own personal use, and the use of such material is at the sole risk of the User. Redistribution or other commercial exploitation of such news material is expressly prohibited. Where such news material is provided by a third party, each User agrees to observe and be bound by the specific terms of use applying to such news material. We do not represent or endorse the accuracy or reliability of any of the info contained in any news or external websites referred to in the news.
Should the content or the design of these sites violate third parties rights or legal prescriptions, we kindly ask you to send us a respective message without invoice or cost. We guarantee that passages where the claim is considered as justified will be removed immediately, without any necessity to involve any lawyer into this issue. We will reject any claim caused by submission of a honorary note in this regard without any prior contact and confirmation of the issueby us and we reserve the right ssue counter claim ourselves because of violation of aforesaid conditions.